|






|
Overview of Class Materials
Ø 203(k) Seminar
Handbook: A complete seminar manual that definitively outlines the
203(k) program. Includes items needed to start performing inspections
including Minimum Property Standards, Mortgagee Letter 95-40 and more.
Ø House Problem/
Solution Index: Contains over 2000 common problems contained in home
and how to disclose these problems to you client. Over 350 pages.
Ø HUD 203(k) Videos:
An actual class videotaped, complete with a actual case study of a
home in Eastern Pennsylvania renovated using 203(k) funds.
Ø Rehab a Home With
HUDs 203(k): HUD Brochure on the 203(k) program. Briefly outlines
the 203(k)program in readily understandable plain English.
Ø Rehab Consultants
Field Training Guide: A manual describing the inspection process and
how performing a feasibility study and work write coincide with the
home inspection process.
Ø Computer Disk.
Learning Mode & Test Mode: Over 600 questions regarding the 203(k)
program, inspecting, and other subjects covered in class. 350 of these
questions are sent back to ISB for grading and final certificate.
Department of Housing and Urban Development
Overview
Ø 203(k) Program
has been around for over 20 years. Program was streamlined considerably
two years ago. Loan times went from over 3 months to closing to in
most cases under 30 days for closing. Program now resembles the 203(b)
program with an expanded home inspection. Streamlining opened up position
of independent consultants. Loan production has soared as a result
of the streamlining.
|
Year
|
Number
of Loans
|
|
1994
|
3500
|
|
1995
|
8500
|
|
01/1996-04/1996
|
15,000
|
Source: Pat Porter - Crossland Mortgage
Ø HUD Primary Goals.
To renovate existing housing stock in all areas throughout out the
United States.
Ø Eligible Properties:
With some renovation and acquisition exceptions most 1-4 unit buildings
over one year old are 203(k) qualified.
Ø How The Program
Can Be Used: Limitations, Guidelines, Repairs allow, Repairs not allowed.
Ø HUD Loan Limits.
How to check local loan limits for you HUD office. Discussion of minimum
amount of repairs.
Improvements
Ø Required Improvement:
All units must meet all applicable local codes and HUDs Minimum
Property Standards. These items must be written up before any eligible
repairs can be made.
Ø Eligible Improvements:
Repairs that HUD will allow for. There is a $5,000 Minimum; some eligible
improvements include New built-in Appliances and Walkway or
Driveway if a health/safety item.
Ø Hazard Improvements:
Correction of Lead Based Peeling Paint in buildings constructed prior
to 1978.
Ø Additional Improvements
allowed over $5,000 Minimum include much everything except for luxury
items outlined below.
Ø Improvements not
allowed: List of improvements not allowed to be performed under the
203(k) program.
Ø Commercial Spaces;
Discussion on the eligibility of the 203(k) program on commercial
and mixed use properties.
Maximum Mortgage Amounts
Ø Maximum Mortgage
Calculations: How they are performed.
Ø Cost Of Rehabilitation:
How it is determined, contingency, inspection fees, etc.
Ø Exemption of Market
Value: What is it, how it is used.
Ø Solar Energy Increase:
what this program is and how it is used.
Ø Energy Efficient
Mortgage Program: Allows the cost of energy efficient items to be
included in the mortgage with out increasing the borrowers mortgage
eligibility.
Ø Title 1 Loan:
Another rehabilitation loan program that is an alternative to the
203(k) loan product.
Application Process
Who You Work For And When
Ø Your job as the
eyes and ears of HUD and the Bank. Your job to report any detrimental
conditions that are here during construction.
Ø Borrower: You
are to give guidance during the feasibility study and the work write-up
package.
Ø Must explain process
to Realtor; Bank; Consultant; Appraiser; Contractor; Code Inspector.
Ø How to instill
realistic expectations. Compromise Vs Cost
Ø Allotting Time
Required For Each Project.
Ø How to instill
quality control at the draw inspection stage. How to properly release
monies to the contractor.
Ø How to show the
originator that the costs contained in the work-write up is realistic.
Ø Recommended turn
around time for each report is with one to two weeks.
Ø HUD: Correcting
All Required Deficiencies According To Guidelines
Ø Remodel an Unusable
Property Into Livable Conditions
Ø Quality Control
at Draws - Release Money To Contractor
Your Job As Plan Reviewer
Ø Plan Reviewers
Certification (Text Tab 3)
Your Job As Consultant
Ø Written Agreement
With Client - Fees
Ø Feasibility Study
Ø Write UP
Ø Architectural
Exhibits
Ø Definitions
Ø Consultants Role
Ø 35 HUD Divisions
Ø Form HUD 9746-A
Ø Rehab Checklist
Ø Field Training
Guide
Your Job as Draw Inspector
Ø Form HUD 9746-A
(Text Tab 1)
Working With Banks (Appraisers)
Ø Rehab Team Concept
(Text - Rehab. Team Tab)
Working With Contractors
Ø Client as Contractor
(Text Tab 2)
Ø Materials Only,
No Labor
Marketing
Ø -Banks & Mortgage
Companies
Ø -Real Estate Agents
Ø -Contractors That
Do 203(k) Work
THE SUPPORT MATERIALS TO
MATCH THE NEED
For all students
attending the 203(k) program
FHA 203(k) Seminar Workbook
Rehabilitation Consultants Guide
House Problem/Solution Guide
400 Question Learning/Certification
Disk
Specification Writers Guide
Quick Estimators Guide
Feasibility Study Guide
Work Write-Up Take Off-Guide
Life Cycle Cost Guide
|